The Duportail Bridge is the final segment in the Duportail / Stevens Corridor strategy to provide improved multi-modal connectivity between central Richland and the Queensgate area.Duportail Bridge Dwg

Phase 1 will construct the bridge, which will include two vehicle travel lanes in each direction, with bicycle lanes and sidewalks on each side. Tanglewood Drive will connect Duportail Street to the residential developments to the north and the south. The intersection of Duportail Street and Tanglewood Drive will be controlled by a traffic signal. The project will also replace a water supply pipeline, currently located in the Yakima River, with two bridge-mounted pipelines. 

Phase 2 will address intersection of Duportail Street and SR240, which will be widened and improved, as will the at-grade railroad crossing on the Port of Benton Railroad.

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Flash Player Windows Media Player Microsoft Silverlight Word Viewer Excel Viewer PowerPoint Viewer